Vidrosoftware

How to validate a water-network mincut analysis

A mincut analysis identifies which valves can isolate a failure and which elements are affected according to the inventory topology. The Rawson demo uses a simulated network to compare a baseline with a scenario in which one valve is unavailable.

Explore the sample water supply and drainage map
The map highlights in red the pipe segment affected by a simulated isolation
Rawson demo · Simulated infrastructure

Set the baseline in the Rawson demo

Freeze a version of the inventory and select a pipe with valves and meters you can check on the map. Before calculating, record which segments should be isolated based on known connectivity. Keep the pipe and valve identifiers alongside the inventory version.

Reference result from the demo

In one documented Rawson reference run, local isolation returned one affected pipe, two service connections, two meters and two proposed closure valves. The counts come from the simulated inventory used for that test. Store them alongside the identifiers to detect changes when the topology is updated.

Change one condition and compare

Mark one proposed closure valve as unavailable and recalculate against the same inventory version. Check for an alternative closure or remaining supply paths. Compare valves, segments and meters by ID to distinguish changes in the result from differences in how the map displays them.

Check the result against the inventory

If a meter appears in the polygon but is absent from the list, check its service connection and the network topology. Verify that the proposed closures are recorded as operable and review the plan with the responsible team before using it for a real intervention.

Checks on the simulated Rawson network
ScenarioWhat to compareReview criterion
BaselineValves, segments and metersThe returned elements match the expected scenario for the test topology.
Unavailable valveAlternative closures and changes to the affected areaThe result excludes the valve and changes can be explained by connectivity.
Unlinked meterMeter list and inventory relationshipsThe team can identify which relationship must be completed to validate the impact.

Frequently asked questions

Does the polygon confirm which customers lose supply?
The list depends on how customers and meters are linked to the inventory and which supply paths remain available. Validate those links and the current network state before using the result.
How do I document a repeatable test?
Store the inventory version, starting segment, exclusions, closure valves and affected-element lists. Run the analysis again against the same version to verify the result.

Technical references

Product and integration details

Solutions

How to publish a white-label GIS viewer

A white-label GIS viewer embeds map layers and tools in a website with the organisation’s branding. gis2web provides a browser-based administration interface and iframe embeds, with a REST API and SDK for workflows that interact with the host application.

Manage maintenance teams and assets on a map

GeoGMAO helps teams plan network maintenance on a map and assign work to field crews. Operators record inspections in digital forms linked to assets, which can come from a Giswater inventory.